{"id":8,"date":"2012-03-30T22:23:46","date_gmt":"2012-03-30T22:23:46","guid":{"rendered":"http:\/\/ecotrains.co.uk\/?page_id=8"},"modified":"2020-02-14T01:40:06","modified_gmt":"2020-02-14T01:40:06","slug":"homepage","status":"publish","type":"page","link":"https:\/\/ecotrains.co.uk\/","title":{"rendered":"Our Aim"},"content":{"rendered":"<p style=\"text-align: justify;\"><em><span style=\"color: #003300;\"><strong>EcoTrains is a not-for-profit organisation SPONSORING RESEARCH and building ECO- RAILWAY LINE PROTOTYPES on our land, in pursuit of reducing harmful greenhouse gas emissions. At our core is the intention to help transform railway systems from being major polluters into a key component in the battle against climate change. Moving from diesel railroad engine (and aircraft aviation fuel pollution) to wind turbine powered electric trains. Simply put:-<\/strong><\/span><\/em><\/p>\n<h3 style=\"text-align: center;\"><span style=\"color: #000080;\"><strong><strong>THIS&#8230;<\/strong><\/strong><\/span><\/h3>\n<p style=\"text-align: center;\"><a href=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/EcoTrainWindmill1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-50 aligncenter\" title=\"EcoTrainWindmill\" src=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/EcoTrainWindmill1.jpg\" alt=\"\" width=\"560\" height=\"826\" srcset=\"https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/EcoTrainWindmill1.jpg 560w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/EcoTrainWindmill1-203x300.jpg 203w\" sizes=\"auto, (max-width: 560px) 100vw, 560px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #808080;\">Wind Turbines (c) 1999-2020 Russ McLean &amp; Argyll Group plc<\/span><\/p>\n<h3 style=\"text-align: center;\"><span style=\"color: #000080;\"><strong>PLUS A WHOLE LOT MORE OF THESE&#8230;<\/strong><\/span><\/h3>\n<p><a href=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/Clever-play-on-the-Tesco-logo-to-read-Less-Co2-ECO-FREIGHT-at-Wilsden-Junction-Photo-By-Christophen-Hilton.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-106\" src=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/Clever-play-on-the-Tesco-logo-to-read-Less-Co2-ECO-FREIGHT-at-Wilsden-Junction-Photo-By-Christophen-Hilton.jpg\" alt=\"Clever play on the Tesco logo to read - Less Co2 - ECO FREIGHT at Wilsden Junction Photo By Christophen Hilton\" width=\"640\" height=\"480\" srcset=\"https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/Clever-play-on-the-Tesco-logo-to-read-Less-Co2-ECO-FREIGHT-at-Wilsden-Junction-Photo-By-Christophen-Hilton.jpg 640w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/Clever-play-on-the-Tesco-logo-to-read-Less-Co2-ECO-FREIGHT-at-Wilsden-Junction-Photo-By-Christophen-Hilton-300x225.jpg 300w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/Clever-play-on-the-Tesco-logo-to-read-Less-Co2-ECO-FREIGHT-at-Wilsden-Junction-Photo-By-Christophen-Hilton-400x300.jpg 400w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #808080;\">Electric Powered Eco Friendly Freight Trainsstopher Hilton<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #800000;\"><strong><strong><strong>MINUS MUCH OF THIS&#8230;<\/strong><\/strong><\/strong><\/span><\/p>\n<p><a href=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/12\/Ecotrains-Lorry-Fumes.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-194\" src=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/12\/Ecotrains-Lorry-Fumes.jpg\" alt=\"\" width=\"781\" height=\"473\" srcset=\"https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/12\/Ecotrains-Lorry-Fumes.jpg 781w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/12\/Ecotrains-Lorry-Fumes-300x182.jpg 300w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/12\/Ecotrains-Lorry-Fumes-768x465.jpg 768w\" sizes=\"auto, (max-width: 781px) 100vw, 781px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #999999;\">\u00a0Lorries Pumping Out Pollution Can Be Reduced. Current Heavy Goods Vehicles &#8211;\u00a0China: 25,680,000 + EU: 6,000,000 + USA: 3,680,000 + Russia: 1,700,000 + Canada: 700,000 + India: 660,000 + UK:\u00a0293,204.<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #800000;\"><strong><strong><strong>MEANS FAR FEWER OF\u00a0<\/strong>THESE<\/strong><strong>&#8230;<\/strong><\/strong><\/span><span style=\"color: #000000;\"><a href=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/EcoTrainDieselTanker1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-55\" title=\"EcoTrainDieselTanker\" src=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/EcoTrainDieselTanker1.jpg\" alt=\"\" width=\"864\" height=\"443\" srcset=\"https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/EcoTrainDieselTanker1.jpg 864w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/EcoTrainDieselTanker1-300x153.jpg 300w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/EcoTrainDieselTanker1-500x256.jpg 500w\" sizes=\"auto, (max-width: 864px) 100vw, 864px\" \/><\/a><\/span><span style=\"color: #808080;\">Diesel Fuel Oil Tanker (c) 1999-2020 Russ McLean &amp; Argyll Group plc<\/span><\/p>\n<h3 style=\"text-align: center;\"><span style=\"color: #000080;\"><strong><strong>EQUALS A BIG MOVE <\/strong><\/strong><\/span><\/h3>\n<h3 style=\"text-align: center;\"><span style=\"color: #000080;\"><strong><strong>TO PRESERVING THIS&#8230;<\/strong><\/strong><\/span><br \/>\n<a href=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/Earth-NASA.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-57\" title=\"Earth NASA\" src=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/Earth-NASA.jpg\" alt=\"\" width=\"643\" height=\"600\" srcset=\"https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/Earth-NASA.jpg 643w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/Earth-NASA-300x279.jpg 300w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2012\/03\/Earth-NASA-321x300.jpg 321w\" sizes=\"auto, (max-width: 643px) 100vw, 643px\" \/><\/a><\/h3>\n<p style=\"text-align: center;\"><span style=\"color: #808080;\">The Earth (c) 1972 Harrison Schmitt, Ron Evans, and NASA.<\/span><\/p>\n<h3 style=\"text-align: center;\"><span style=\"color: #800000;\"><strong>SIMPLE ARITHMETIC<\/strong><\/span><\/h3>\n<h3 style=\"text-align: center;\"><span style=\"color: #008000;\"><strong>Ecotrains = Zero Transport Pollution<\/strong><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><em><strong> A wind turbine every mile turns our worldwide freight system into a planet-saving transport network. Simply put&#8230;<\/strong><\/em><\/span><\/p>\n<hr \/>\n<h3 style=\"text-align: center;\"><span style=\"color: #000080;\"><strong><span style=\"text-decoration: underline;\">But First A Thank You<\/span><\/strong><\/span><\/h3>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><strong><em>What the world owes a 16 year old student is beyond evaluation. We have been working on this ecotrains project since 2012. Steady progress has been made. <\/em><\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><strong><em>For example:-<\/em><\/strong><\/span><\/p>\n<blockquote>\n<p style=\"text-align: justify;\"><span style=\"color: #000080;\"><strong>One of our supporters is making a \u00a33,000 bursary for a Ph.D student to research and study the wind-turbine powered electric train initiative and the effect a major rollout on an international level would have on climate change.<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #000080;\"><strong style=\"font-size: 1em;\">Our core support network has already raised \u00a350,000 on a matched-funding basis to a \u00a3100,000 target to purchase a suitable (former) railway line track bed in order to build a &#8220;proof of concept&#8221; real-world<\/strong><strong style=\"font-size: 1em;\">\u00a0ecotrain for testing and study. The expresion of &#8220;parking your tank on the opponents lawn&#8221; can be papraphrased in that we will be parking our eco locomotive on the lawn of climate change deniers.<\/strong><\/span><\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\"><strong style=\"font-size: 1em; color: #003300;\"><em>The past 7 years here at ecotrains has been hard work and slow. But many of us owe a debt of gratitude to Greta Thunberg and her capturing the world imagination as to the extent of the ecological crisis headed this way. We have seen a boost in our own project. Interest in the proposals on our website and the real-world changes we can make to help stop this crisis has been tangible. Our wind-turbine powered train and zero pollution systems are much closer now. Thank you Greta.<\/em><\/strong><\/p>\n<p><a href=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Greta.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-165\" src=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Greta.jpg\" alt=\"\" width=\"713\" height=\"436\" srcset=\"https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Greta.jpg 713w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Greta-300x183.jpg 300w\" sizes=\"auto, (max-width: 713px) 100vw, 713px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #000000;\"><strong>Greta Thunberg Social Media Pages: Facebook <span style=\"text-decoration: underline;\"><span style=\"color: #000080; text-decoration: underline;\"><a style=\"color: #000080; text-decoration: underline;\" href=\"https:\/\/www.facebook.com\/gretathunbergsweden\/\" target=\"_blank\" rel=\"noopener\">Click Here<\/a><\/span><\/span>. Twitter: <span style=\"text-decoration: underline;\"><span style=\"color: #000080; text-decoration: underline;\"><a style=\"color: #000080; text-decoration: underline;\" href=\"https:\/\/twitter.com\/GretaThunberg?ref_src=twsrc%5Egoogle%7Ctwcamp%5Eserp%7Ctwgr%5Eauthor\" target=\"_blank\" rel=\"noopener\">Click Here<\/a><\/span><\/span>.\u00a0<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><strong><em>Thanks to the awakening to climate change this remarkable human being has brought about, our small project is firmly on the way to developing a protocol that can remove vast amounts of pollution from the transport and eco systems. <\/em><\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><strong><em>We have been overwhelmed by the support from around the time Greta started her journey as one person on a mission.<\/em><\/strong><\/span><\/p>\n<p><a href=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Greta-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-166\" src=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Greta-2.jpg\" alt=\"\" width=\"617\" height=\"368\" srcset=\"https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Greta-2.jpg 617w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Greta-2-300x179.jpg 300w\" sizes=\"auto, (max-width: 617px) 100vw, 617px\" \/><\/a><\/p>\n<p><span style=\"color: #003300;\"><strong><em>Greta, in reciprocation we can promise you our best efforts to avoid your generation being literally drowned away to extinction by the climate change crisis.<\/em><\/strong><\/span><\/p>\n<p><a href=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Greta-3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-167\" src=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Greta-3.jpg\" alt=\"\" width=\"522\" height=\"525\" srcset=\"https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Greta-3.jpg 522w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Greta-3-150x150.jpg 150w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Greta-3-298x300.jpg 298w\" sizes=\"auto, (max-width: 522px) 100vw, 522px\" \/><\/a><\/p>\n<p><span style=\"color: #003300;\"><strong><em>If we have anything to do with this, the repair to the planet&#8217;s eco-system will happen.<\/em><\/strong><\/span><\/p>\n<p><span style=\"color: #003300;\"><strong><em>The solutions are already here&#8230;<\/em><\/strong><\/span><\/p>\n<p><a href=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Matt-Batryn-Rodriguez.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-168\" src=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Matt-Batryn-Rodriguez.jpg\" alt=\"\" width=\"1021\" height=\"674\" srcset=\"https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Matt-Batryn-Rodriguez.jpg 1021w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Matt-Batryn-Rodriguez-300x198.jpg 300w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-Matt-Batryn-Rodriguez-768x507.jpg 768w\" sizes=\"auto, (max-width: 1021px) 100vw, 1021px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #000000;\"><strong>Massive Pollution Can Be Reversed &amp; Within 10 Years<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><em><strong>The photograph above shows&#8230;<\/strong><\/em><\/span><\/p>\n<blockquote>\n<p style=\"text-align: justify;\"><span style=\"color: #bd5002;\"><strong>3 of the 4 primary components needed to cure global warming!<\/strong><\/span><\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><em><strong>(1) Railway TRACKS and<\/strong><\/em><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><em><strong>(2) WIND TURBINES,<\/strong><\/em><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><em><strong>(3) LOCOMOTIVES. Though the ones pictured above require changing to ELECTRIC powered engines.<\/strong><\/em><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><em><strong>Item number (4) TRANSMISSION INFRASTRUCTURE is remarkably simple&#8230;<\/strong><\/em><\/span><\/p>\n<p><a href=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-170\" src=\"http:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-1.jpg\" alt=\"\" width=\"770\" height=\"427\" srcset=\"https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-1.jpg 770w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-1-300x166.jpg 300w, https:\/\/ecotrains.co.uk\/wp-content\/uploads\/2019\/10\/1-1-Ecotrains-1-768x426.jpg 768w\" sizes=\"auto, (max-width: 770px) 100vw, 770px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #000000;\"><strong>Overhead Railway\/Railroad Electrification. Not That Difficult.<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><em><strong>This fourth element (4) of overhead railroad electrification is already on a constant rollout programme. This needs to be speeded up. There are tens of thousands of miles of railroads without these cables. <\/strong><\/em><\/span><\/p>\n<blockquote>\n<p style=\"text-align: justify;\"><span style=\"color: #000080;\"><strong>Railroads with no overhead electrification require massive pollution diesel engines to work. <\/strong><\/span><\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><em><strong>Ironically these diesel freight trains are a comparatively ecological way of moving the vast amount of containers around the world.<\/strong><\/em><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><em><strong>However, if we can change ALL of the diesel locomotives to electric trains and build a wind-turbine every few miles in parallel to all railway tracks that are viable for wind generators and underground connection systems from out-of-town windfarms to inner-city railway systems, this will impact positively on halting the climate change.<\/strong><\/em><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><em><strong>All governments shall need to encourage massive amounts of road and air freight (90%) from road and air to electric railroad systems. If the summary on this single webpage introduction can be achieved, the view of this website&#8217;s subscribers is that&#8230;<\/strong><\/em><\/span><\/p>\n<blockquote>\n<p style=\"text-align: justify;\"><span style=\"color: #000080;\"><strong>This will impact to a material degree in reducing the extinction rebellion levels of global pollution. Thereby handing our children and grandchildren a chance at a decent future in life.<\/strong><\/span><\/p>\n<\/blockquote>\n<p style=\"text-align: justify;\"><span style=\"color: #003300;\"><em><strong>If you are interested in reading more, and especially if you can volunteer with our Ecotrains Project, please consider making a cup of coffee and joining us for 15 minutes to read more&#8230;<\/strong><\/em><\/span><\/p>\n<hr \/>\n<p style=\"text-align: center;\"><strong><span style=\"text-decoration: underline;\"><span style=\"color: #0000ff; text-decoration: underline;\"><a href=\"http:\/\/ecotrains.co.uk\/?page_id=17\"><span style=\"color: #0000ff; text-decoration: underline;\">NEXT PAGE &#8211; PLEASE CLICK HERE<\/span><\/a><\/span><\/span><\/strong><\/p>\n<hr \/>\n<p style=\"text-align: center;\"><span style=\"color: #999999;\">Ecotrains is a not-for-profit organisation.<\/span><\/p>\n<p style=\"text-align: center;\"><span style=\"color: #999999;\">For further details please get in touch:\u00a0<a style=\"color: #999999;\" href=\"http:\/\/ecotrains.co.uk\/?page_id=46\" target=\"_blank\" rel=\"noopener\"><span style=\"text-decoration: underline;\">click here<\/span>.<\/a><\/span><\/p>\n<hr \/>\n<p style=\"text-align: center;\"><span style=\"color: #999999;\">Header photograph (c) 2020 Mr Peter Reading<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>EcoTrains is a not-for-profit organisation SPONSORING RESEARCH and building ECO- RAILWAY LINE PROTOTYPES on our land, in pursuit of reducing harmful greenhouse gas emissions. At our core is the intention to help transform railway systems from being major polluters into <span class=\"excerpt-dots\">&hellip;<\/span> <a class=\"more-link\" href=\"https:\/\/ecotrains.co.uk\/\"><span class=\"more-msg\">Continue reading &rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-8","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/ecotrains.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/8","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ecotrains.co.uk\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ecotrains.co.uk\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ecotrains.co.uk\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ecotrains.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=8"}],"version-history":[{"count":37,"href":"https:\/\/ecotrains.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/8\/revisions"}],"predecessor-version":[{"id":209,"href":"https:\/\/ecotrains.co.uk\/index.php?rest_route=\/wp\/v2\/pages\/8\/revisions\/209"}],"wp:attachment":[{"href":"https:\/\/ecotrains.co.uk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=8"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}<!-- WP Super Cache is installed but broken. The constant WPCACHEHOME must be set in the file wp-config.php and point at the WP Super Cache plugin directory. -->